Facilities

Facilities

BUILDING 1 (4.200 m2)

  • Department for engineering, simulations and technological development.
  • Project management department.
  • European Project Office (OPE)
  • Physical-chemical laboratory.
  • Dimensional metrology and reverse engineering lab.
  • Training and technology transfer area.
  • Workstations for research staff.
  • An area for R&D start-ups, where technology companies can enjoy an optimal environment to launch their activities.
  • An auditorium with a capacity of up to 160 people.


BUILDING 2 (6.600 m
2)

  • Pilot plant: Injection, extrusion, laminating and thermoforming laboratory. Wire production for FDM.
  • Biodegradability and Compostability laboratory.
  • Photometric tunnel for light measurement (L = 30m), with Goniophotometer and Colormeter.
  • Road simulation tunnel (80m x 20m x 4m, with 3 lanes + shoulders).
  • Experimental pilot testing area.
  • Prototyping and manufacturing area: 3D printing centre, vacuum casting area, mechanisation workshop, painting and metallizing cabins, surface coating workshop.
  • Electronics laboratory.

ENVIRONMENTAL CARE

Andaltec has designated an area of its facilities as a Clean Point for the management of hazardous waste generated by its operations.

By 2021, a reduction in the volume of organic waste generated was achieved.

In 2022, a reduction in the volume of empty aerosols disposed of has been achieved.